ECSlogo

Environmental Construction Solutions Ltd

Today's date:

Lift Pit Liners

With the help of local merchants and civil engineers, we have developed this product to assist contractors to overcome problems associated with the time and expense of building traditional block and membrane constructions.

Each Liner is manufactured to the required dimensions at our factory and is delivered to your site ready for fixing in place. The concrete base and block work surround are still required, but once the liner is placed in position, a waterproof construction is assured. No leak test required.

Lift Pit Diagram 1
lift pit liner List Pit Diagram 2

Our standard GRP Specification for this product includes a rigid 6mm wall thickness, an ipsothalic water resistant gel-coat and class 1 (BS476) self-extinguishing resins. The internal gel-coat is coloured to blue BS18-E-53. External flow coat coloured white. All dimensions to individual customer design requirements.

Special details can be included to suit the requirements of your site. Provision can be made for bolt boxes, service ducts, over or under size flanges etc.

Larger liners which may pose problems with transportation can be delivered in sections and jointed on site be our operatives. This enables 'tanking' of large areas for escalator pits or plant rooms etc.

Brownfield Sites

Where suitable adhesives are used to bond D P membranes to the lire surface, these units can also be considered to form part of a gas-tight membrane suitable for use on brownfield sites where gas and/or leachates may be a cause for concern.


Click below to view PDF diagram Examples
How to Size your Liner
End Elevation
Installation Diagram

Product Range

(Click selection below)

  • Agriculture

  • Attenuation Tanks

  • Atten-U-Cell

  • CamStoppers

  • Cesspool / Holding Tanks

  • Chemical Storage

  • Dosing Systems

  • Drainage Treatments

  • Duo Block

  • Duo Drains

  • Errosion Control

  • Flow Controls

  • GeoTextiles

  • Grease Traps/separator/filters

  • Kiosks

  • Lamina Filtertraps

  • Lift Pit Liners

  • Monitor Alarms

  • Oil Storage Tanks

  • Pump Stations

  • Rain Water Harvesting

  • Root Block

  • Separators

  • Septic Tanks

  • Silage Effluent Tanks

  • Soil Reinforcement Products

  • Specialist HDPE Chemical Tanks

  • Valves

  • Water Treatment

  • ISO 90012

    We accept credit Payments Via Credit card logo's

    Contact Information

    E-mail:
    Telephone:
    Fax:
    Mobile:

    enquiries@ecs-sales.co.uk
    + 44 (0) 8456 123 332
    + 44 (0) 8456 123 334
    + 44 (0) 7946 878 234

    Hours Of Business

    Monday
    Tuesday
    Wednesday
    Thursday
    Friday

    8.45 To 18.00
    8.45 To 18.00
    8.45 To 18.00
    8.45 To 18.00
    8.45 To 16.30

    Home Terms &
    Conditions
    Disclaimer Contact
    Us
    What's
    New

    Head Office:
    Environmental Construction Solutions Limited, Head Office, 21 Kielder Road, South Wellfield, Whitley Bay,
    Tyne & Wear, NE25 9QW, United Kingdom

    Manufacturing Works:
    Unit 3 Rhodes Court, South Nelson Ind Est, Cramlington, Northumberland, NE23 1WF

    Company Reg. No. :
    4566412

    Registered Office:
    C/O BTW LLP, Chartered Accountants, The Old Post Office, 63 Saville Street, North Shields, Tyne & Wear, NE30 1AY.

    VAT No:
    804 4186 46

    Web Design by David Bloomfield.
    Last Updated: 19/01/2005


    © Copyright 2008, ECS Limited. All Content contained herein is copyright and must not be used by any third party without prior written permission.